Hang drywall too early and you bury problems. Use this list before Ron Hogan Drywall — or any crew — puts board on the wall.

The Board Goes Up Last Among the Rough Trades

Drywall hides framing, pipes, and wire. Once it is up, every missed box or crooked stud becomes a cut-out. This checklist is the work that should already be done when we arrive.

Ron Hogan Drywall has been family-owned since 1970. We hang and finish homes and commercial interiors in the Bay Area and Northern California. If an item below is not done, tell us before the hang date.

Before Anyone Hangs Drywall

1. The Building Is Dried In

Roof, windows, and exterior skin should keep rain off the framing. Wet studs and wet board are a bad mix.

2. Framing Is Complete and Straight Enough

Studs, joists, headers, and backing for cabinets, rails, and TVs should be in. Bowed walls will show through a Level 4 or Level 5 finish. Flag bad framing before we cover it.

3. Electrical, Plumbing, and HVAC Rough-In Is Done

Boxes set, pipes in, ducts in. Moving a box after hanging means cutting a finished wall.

4. Required Inspections Have Passed

Framing, electrical, plumbing, and mechanical inspections — whatever your permit requires — should be signed off before board goes up.

5. Insulation and Fire- or Sound-Rated Work Is Planned

If the wall needs insulation, Type X, or QuietRock, that has to be in the scope before hanging starts — not after the painter arrives.

6. Access and Staging Are Clear

A path for boards, a place to stage material, and rooms cleared enough to work. Occupied homes need furniture moved or covered.

7. Finish Level Is Decided

Texture match, knockdown, orange peel, Level 4, or Level 5. Lighting and paint color belong in that conversation. Level 4 vs. Level 5 →

What to Send With Your Estimate Request

  • City and property type (house, addition, office, TI)
  • Approximate square footage or room count
  • Wood or metal studs
  • Photos of framing and any problem walls
  • The finish you want after hanging

Text that to (925) 791-9099.

After the Board Is Up

  1. Hang on wood or metal framing
  2. Tape, coat, and sand
  3. Texture or smooth finish
  4. Prime-ready walls for the painter

That sequence is the job. Skipping tape time or painting the next morning is how joints flash. Installation page →

Common Ways Projects Get Stuck

  • Hanging before electrical inspection
  • No backing for a future TV or rail
  • Wet framing after a leak
  • A “smooth” finish specified on walls that are not straight
  • No plan for who textures after a hang-only bid

Ready for a Hang Date?

1. Run the List

Confirm framing, rough-in, and inspections.

2. Send Photos

Call or text Ron Hogan Sr. with the city and the rooms.

3. We Hang and Finish

Licensed crews, clean sites, 12-month warranty.

Checklist FAQs

Can you hang if one inspection is still open?

Not if the inspector still needs to see the cavity. Covering work too early creates tear-out.

Do you hang and finish?

Yes. One crew can hang, tape, and texture so you are not splitting the job. Finishing →

What if my studs are wavy?

Tell us before hang day. A skim coat will not flatten a badly framed wall.